In the process of installation and commissioning of the pipe press, there are many details that need to be paid attention to. The main matters for attention of the pipe press are handling, installation, micrometer, pressure adjustment, oil injection, electrical connection, and mold opening speed adjustment.
1. Handling: The pipe press is suitable to be transported by forklift, and the pressure is applied to the bottom of the pipe press. The pipe press is strictly prohibited from inverting. It is strictly forbidden to lift the pressure pipe head, motor and electrical box.
2. Installation: The pipe press must be placed horizontally on a stable foundation and grounded. Yongfeng hydraulic: precautions for installation and commissioning of pipe press
3. Micrometer: It is used to adjust the shrinkage of the crimping hose. It is 1mm more in the counterclockwise half a week, and 1mm less than the clockwise half a week.
4. Pressure adjustment: The maximum pressure of the pipe press system is 31.5Mpa, which is adjusted by the overflow valve. The clockwise adjustment pressure increases, and the counterclockwise adjustment pressure decreases (it has been adjusted at the factory, and can be adjusted by itself if necessary). Yongfeng hydraulic: precautions for installation and commissioning of pipe press
5. Oil filling: Open the oil tank cover and add 68# anti-wear hydraulic oil to the 2/3 position of the oil level gauge.
6. Connecting to electricity: Connect the power cord to the specified power source of the pipe crimping machine, start the motor and observe the direction of rotation. The direction of the motor should be consistent with the direction marked by the motor. BNTFLEX hydraulic pressure: Precautions for installation and debugging of the pipe press If the rotation of the motor is inconsistent with the marked direction, please change the position of two of the power cords.
7. Mold opening speed adjustment: The mold opening speed is controlled by the diverter valve and adjusted clockwise. The opening speed is increased, and the opening speed is adjusted counterclockwise. The opening speed is slowed down, but too fast opening speed will increase the noise. , The best value is not more than 10Mpa (it has been adjusted before leaving the factory, you can adjust it yourself if necessary).
The installation and commissioning of the pipe press cannot be ignored. Perhaps it is this sloppy that causes the quality of the pipe press to be reduced and the life span is shortened, which will directly affect the benefit of the enterprise.
How to install and debug the crimping machine
(Summary description)How to install and debug the crimping machine
In the process of installation and commissioning of the pipe press, there are many details that need to be paid attention to. The main matters for attention of the pipe press are handling, installation, micrometer, pressure adjustment, oil injection, electrical connection, and mold opening speed adjustment.
1. Handling: The pipe press is suitable to be transported by forklift, and the pressure is applied to the bottom of the pipe press. The pipe press is strictly prohibited from inverting. It is strictly forbidden to lift the pressure pipe head, motor and electrical box.
2. Installation: The pipe press must be placed horizontally on a stable foundation and grounded. Yongfeng hydraulic: precautions for installation and commissioning of pipe press
3. Micrometer: It is used to adjust the shrinkage of the crimping hose. It is 1mm more in the counterclockwise half a week, and 1mm less than the clockwise half a week.
4. Pressure adjustment: The maximum pressure of the pipe press system is 31.5Mpa, which is adjusted by the overflow valve. The clockwise adjustment pressure increases, and the counterclockwise adjustment pressure decreases (it has been adjusted at the factory, and can be adjusted by itself if necessary). Yongfeng hydraulic: precautions for installation and commissioning of pipe press
5. Oil filling: Open the oil tank cover and add 68# anti-wear hydraulic oil to the 2/3 position of the oil level gauge.
6. Connecting to electricity: Connect the power cord to the specified power source of the pipe crimping machine, start the motor and observe the direction of rotation. The direction of the motor should be consistent with the direction marked by the motor. BNTFLEX hydraulic pressure: Precautions for installation and debugging of the pipe press If the rotation of the motor is inconsistent with the marked direction, please change the position of two of the power cords.
7. Mold opening speed adjustment: The mold opening speed is controlled by the diverter valve and adjusted clockwise. The opening speed is increased, and the opening speed is adjusted counterclockwise. The opening speed is slowed down, but too fast opening speed will increase the noise. , The best value is not more than 10Mpa (it has been adjusted before leaving the factory, you can adjust it yourself if necessary).
The installation and commissioning of the pipe press cannot be ignored. Perhaps it is this sloppy that causes the quality of the pipe press to be reduced and the life span is shortened, which will directly affect the benefit of the enterprise.
- Categories:Company News
- Author:
- Origin:
- Time of issue:2021-03-25
- Views:0
How to install and debug the crimping machine
In the process of installation and commissioning of the pipe press, there are many details that need to be paid attention to. The main matters for attention of the pipe press are handling, installation, micrometer, pressure adjustment, oil injection, electrical connection, and mold opening speed adjustment.
1. Handling: The pipe press is suitable to be transported by forklift, and the pressure is applied to the bottom of the pipe press. The pipe press is strictly prohibited from inverting. It is strictly forbidden to lift the pressure pipe head, motor and electrical box.
2. Installation: The pipe press must be placed horizontally on a stable foundation and grounded. Yongfeng hydraulic: precautions for installation and commissioning of pipe press
3. Micrometer: It is used to adjust the shrinkage of the crimping hose. It is 1mm more in the counterclockwise half a week, and 1mm less than the clockwise half a week.
4. Pressure adjustment: The maximum pressure of the pipe press system is 31.5Mpa, which is adjusted by the overflow valve. The clockwise adjustment pressure increases, and the counterclockwise adjustment pressure decreases (it has been adjusted at the factory, and can be adjusted by itself if necessary). Yongfeng hydraulic: precautions for installation and commissioning of pipe press
5. Oil filling: Open the oil tank cover and add 68# anti-wear hydraulic oil to the 2/3 position of the oil level gauge.
6. Connecting to electricity: Connect the power cord to the specified power source of the pipe crimping machine, start the motor and observe the direction of rotation. The direction of the motor should be consistent with the direction marked by the motor. BNTFLEX hydraulic pressure: Precautions for installation and debugging of the pipe press If the rotation of the motor is inconsistent with the marked direction, please change the position of two of the power cords.
7. Mold opening speed adjustment: The mold opening speed is controlled by the diverter valve and adjusted clockwise. The opening speed is increased, and the opening speed is adjusted counterclockwise. The opening speed is slowed down, but too fast opening speed will increase the noise. , The best value is not more than 10Mpa (it has been adjusted before leaving the factory, you can adjust it yourself if necessary).
The installation and commissioning of the pipe press cannot be ignored. Perhaps it is this sloppy that causes the quality of the pipe press to be reduced and the life span is shortened, which will directly affect the benefit of the enterprise.
Scan the QR code to read on your phone
CONTACT FORM
We’ll take the time to explain the recommended solution and its price
CONTACT
Mona Tel: +8618522290645
Email: mona@bntflex.com
Wechat/Whatsapp:+8618522290645
Skype: barnettcrimpingmachine
Copyright © 2019 Dalian Barnett Flex Hydraulics Co.,Ltd. 辽ICP备20000203号