Installation and commissioning of automatic pipe cutting machine
Time of issue:
2021-06-15
Installation and commissioning of automatic pipe cutting machine The automatic pipe cutting machine is a special processing equipment for pipe processing and application industries. The automatic pipe cutting machine is mainly used for the automatic cutting of various metal pipe T, K, Y and other joint forms in the offshore oil jacket and offshore oil platform manufacturing engineering. I have probably understood the automatic cutting machine, and I will introduce the installation and debugging steps for everyone. The laser cutting machine tool must be installed on a horizontally painted concrete floor, and fixed on the ground with bolts in accordance with the screw holes of the machine base to correct the level. Connect the power and air source. This machine uses three-phase four-wire AC power, which must be grounded reliably. The air supply pipe is directly connected to the air inlet pipe of the machine, and the pressure is not more than 0.9Mpa. After the power is turned on, adjust the steering, turn on the power switch, and start the machine head motor. The direction of rotation must be consistent with the direction of the arrow. After ventilation, all the pressing cylinders are in the rising state, all the scales are in the extended state, the head is not pressed, the clamping cylinder is opened, and the blanking cylinder is in the extended state. Install the saw blade, and the direction of the serrated tip is the same as the direction of the arrow on the safety cover. When installing, please pay attention to whether the airflow direction is consistent with the direction indicated by the arrow on the body, and pay attention to whether the connecting pipe and tooth shape are correct. Pressure adjustment: Pull up the pressure adjusting knob and turn it clockwise, the pressure will rise, and turn it counterclockwise, the pressure will drop. Adjust to the required pressure, and press the pressure regulating knob to lock it. When there is no air pressure, the water is automatically discharged. When there is air pressure, the discharge column is pushed up to discharge the water. After the drain is completed, the drain column is released, and the drain column automatically bounces down, and the drain is finished. When the water level exceeds the upper limit, please drain water immediately, otherwise it will cause poor dehumidification. Oil volume adjustment: Turn the needle valve clockwise to reduce the amount of oil dripping, and rotate the needle valve counterclockwise to increase the amount of oil dripping. Air flow adjustment, after setting the needle valve, the air flow is large, the oil dripping volume is large, the air flow volume is small, and the oil dripping volume is small. Refueling method: You can refuel without closing the air pipeline. Turn the refueling screw counterclockwise. When refueling, please do not fill more than 80% of the cup. After refueling, tighten the refueling screw, and do not directly remove the oil reservoir for refueling. Cleaning/replacement of the filter: Take out the filter and blow it from the inside to the outside with air to reuse it. Remove the pc cup and wipe it with a clean dry cloth. Do not use any chemicals that will damage the material of the pc cup to clean it. The editor talks about the installation and debugging steps of the automatic pipe cutting machine. Only by firmly grasping these can you be more relaxed when installing and using the automatic pipe cutting machine, and work efficiency can be improved.
Installation and commissioning of automatic pipe cutting machine
The automatic pipe cutting machine is a special processing equipment for pipe processing and application industries. The automatic pipe cutting machine is mainly used for the automatic cutting of various metal pipe T, K, Y and other joint forms in the offshore oil jacket and offshore oil platform manufacturing engineering. I have probably understood the automatic cutting machine, and I will introduce the installation and debugging steps for everyone.
The laser cutting machine tool must be installed on a horizontally painted concrete floor, and fixed on the ground with bolts in accordance with the screw holes of the machine base to correct the level.
Connect the power and air source. This machine uses three-phase four-wire AC power, which must be grounded reliably. The air supply pipe is directly connected to the air inlet pipe of the machine, and the pressure is not more than 0.9Mpa. After the power is turned on, adjust the steering, turn on the power switch, and start the machine head motor. The direction of rotation must be consistent with the direction of the arrow. After ventilation, all the pressing cylinders are in the rising state, all the scales are in the extended state, the head is not pressed, the clamping cylinder is opened, and the blanking cylinder is in the extended state.
Install the saw blade, and the direction of the serrated tip is the same as the direction of the arrow on the safety cover.
When installing, please pay attention to whether the airflow direction is consistent with the direction indicated by the arrow on the body, and pay attention to whether the connecting pipe and tooth shape are correct.
Pressure adjustment: Pull up the pressure adjusting knob and turn it clockwise, the pressure will rise, and turn it counterclockwise, the pressure will drop. Adjust to the required pressure, and press the pressure regulating knob to lock it.
When there is no air pressure, the water is automatically discharged. When there is air pressure, the discharge column is pushed up to discharge the water. After the drain is completed, the drain column is released, and the drain column automatically bounces down, and the drain is finished. When the water level exceeds the upper limit, please drain water immediately, otherwise it will cause poor dehumidification.
Oil volume adjustment: Turn the needle valve clockwise to reduce the amount of oil dripping, and rotate the needle valve counterclockwise to increase the amount of oil dripping. Air flow adjustment, after setting the needle valve, the air flow is large, the oil dripping volume is large, the air flow volume is small, and the oil dripping volume is small.
Refueling method: You can refuel without closing the air pipeline. Turn the refueling screw counterclockwise. When refueling, please do not fill more than 80% of the cup. After refueling, tighten the refueling screw, and do not directly remove the oil reservoir for refueling.
Cleaning/replacement of the filter: Take out the filter and blow it from the inside to the outside with air to reuse it. Remove the pc cup and wipe it with a clean dry cloth. Do not use any chemicals that will damage the material of the pc cup to clean it.
The editor talks about the installation and debugging steps of the automatic pipe cutting machine. Only by firmly grasping these can you be more relaxed when installing and using the automatic pipe cutting machine, and work efficiency can be improved.