Installation of high pressure hose blasting test bench
Time of issue:
2021-02-18
3.1 After arriving at the site, you should carefully check whether each part meets the predetermined scope of the contract, whether the supply meets the requirements of the design drawings, and whether there is any damage, otherwise you should contact the manufacturer in time. 3.2 After the test bench arrives at the site, it should be securely placed in the designated location as required. 3.3 After each part is in place, please operate as required. Four, test bench debugging instructions 4.1 For the commissioning of the built-in pneumatic hydraulic booster pump, please refer to the content of 4 in "XRY Pneumatic Hydraulic Booster Pump Instructions". 5. Operation and use of test bench 5.1 Before use, check the various components of the system, whether the handles are in the correct position, and whether the solid screws of the pipe connections are loose. If everything is normal, the test bench can be put into operation. 5.2 The working pressure of the system should be checked at any time during use, and the high-pressure connections should be checked for looseness at any time to avoid abnormal accidents.
3.1 After arriving at the site, you should carefully check whether each part meets the predetermined scope of the contract, whether the supply meets the requirements of the design drawings, and whether there is any damage, otherwise you should contact the manufacturer in time.
3.2 After the test bench arrives at the site, it should be securely placed in the designated location as required.
3.3 After each part is in place, please operate as required.
Four, test bench debugging instructions
4.1 For the commissioning of the built-in pneumatic hydraulic booster pump, please refer to the content of 4 in "XRY Pneumatic Hydraulic Booster Pump Instructions".
5. Operation and use of test bench
5.1 Before use, check the various components of the system, whether the handles are in the correct position, and whether the solid screws of the pipe connections are loose. If everything is normal, the test bench can be put into operation.
5.2 The working pressure of the system should be checked at any time during use, and the high-pressure connections should be checked for looseness at any time to avoid abnormal accidents.
Keyword:
high,the,of,in,whether,should,at,be,test,bench