Installation and debugging of the hose crimping machine
Time of issue:
2021-04-30
Installation and debugging of the hose crimping machine Installation and debugging of the hose crimping machine Handling: The pipe buckle machine is suitable for forklift transportation, and the bottom of the pipe buckle machine is stressed. The pipe buckle machine is strictly forbidden to be inverted. It is strictly forbidden to lift the head of the buckle tube, motor and electrical box. Installation: The hose crimping machine must be placed horizontally on a stable foundation and grounded. Oil filling: Open the oil tank cover and add 68# anti-wear hydraulic oil to the 2/3 position of the oil level gauge. Electricity connection: Connect the power cord to the power supply specified by the tube press, start the motor and observe the direction of rotation. The direction of the motor should be consistent with the direction marked by the motor. If the direction of the motor is inconsistent with the marked direction, please change the position of two of the power cords. Micrometer: used to adjust the shrinkage of the crimping hose, press in more than 1mm counterclockwise half a week, and less than 1mm in clockwise half a week. Pressure adjustment: The maximum pressure of the pipe buckle machine system is 31.5Mpa, which is adjusted by the overflow valve. The clockwise adjustment pressure increases, and the counterclockwise adjustment pressure decreases (it has been adjusted at the factory, and can be adjusted by itself if necessary). Mold opening speed adjustment: the speed of mold opening speed is controlled by the diverter valve. It is adjusted clockwise, the opening speed is increased, and the counterclockwise adjustment is adjusted. The opening speed slows down, but the opening speed is too fast to increase the noise. The best value is not more than 10Mpa (it has been adjusted before leaving the factory, you can adjust it yourself if necessary).
Installation and debugging of the hose crimping machine
Installation and debugging of the hose crimping machine
Handling: The pipe buckle machine is suitable for forklift transportation, and the bottom of the pipe buckle machine is stressed. The pipe buckle machine is strictly forbidden to be inverted. It is strictly forbidden to lift the head of the buckle tube, motor and electrical box.
Installation: The hose crimping machine must be placed horizontally on a stable foundation and grounded.
Oil filling: Open the oil tank cover and add 68# anti-wear hydraulic oil to the 2/3 position of the oil level gauge.
Electricity connection: Connect the power cord to the power supply specified by the tube press, start the motor and observe the direction of rotation. The direction of the motor should be consistent with the direction marked by the motor. If the direction of the motor is inconsistent with the marked direction, please change the position of two of the power cords.
Micrometer: used to adjust the shrinkage of the crimping hose, press in more than 1mm counterclockwise half a week, and less than 1mm in clockwise half a week.
Pressure adjustment: The maximum pressure of the pipe buckle machine system is 31.5Mpa, which is adjusted by the overflow valve. The clockwise adjustment pressure increases, and the counterclockwise adjustment pressure decreases (it has been adjusted at the factory, and can be adjusted by itself if necessary).
Mold opening speed adjustment: the speed of mold opening speed is controlled by the diverter valve. It is adjusted clockwise, the opening speed is increased, and the counterclockwise adjustment is adjusted. The opening speed slows down, but the opening speed is too fast to increase the noise. The best value is not more than 10Mpa (it has been adjusted before leaving the factory, you can adjust it yourself if necessary).