Installation and debugging of crimping machine


Time of issue:

2021-04-29

Installation and debugging of crimping machine Installation and debugging of crimping machine Handling: The pipe buckle machine is suitable for forklift transportation, and the bottom of the pipe buckle machine is stressed. The pipe buckle machine is strictly forbidden to be inverted. It is strictly forbidden to lift the head of the buckle tube, motor and electrical box. Installation: The pipe crimping machine must be placed horizontally on a stable foundation and grounded. Oil filling: Open the oil tank cover and add 68# anti-wear hydraulic oil to the 2/3 position of the oil level gauge. Electricity connection: Connect the power cord to the power supply specified by the tube press, start the motor and observe the direction of rotation. The direction of the motor should be consistent with the direction marked by the motor. If the direction of the motor is inconsistent with the marked direction, please change the position of the two power cords. Micrometer: It is used to adjust the shrinkage of the crimping hose. It is 1mm more in the counterclockwise half a week, and 1mm less than the clockwise half a week. Pressure adjustment: The maximum pressure of the buckle machine system is 31.5Mpa, which is adjusted by the overflow valve. The clockwise adjustment pressure increases, and the counterclockwise adjustment pressure decreases (it has been adjusted at the factory, and can be adjusted by itself if necessary). Mold opening speed adjustment: The mold opening speed is controlled by the diverter valve and adjusted clockwise. The opening speed is increased, and the opening speed is adjusted counterclockwise. The opening speed slows down, but too fast opening speed will increase the noise. The best value is not more than 10Mpa (it has been adjusted before leaving the factory, you can adjust it yourself if necessary).

Installation and debugging of crimping machine

Installation and debugging of crimping machine

Handling: The pipe buckle machine is suitable for forklift transportation, and the bottom of the pipe buckle machine is stressed. The pipe buckle machine is strictly forbidden to be inverted. It is strictly forbidden to lift the head of the buckle tube, motor and electrical box.

Installation: The pipe crimping machine must be placed horizontally on a stable foundation and grounded.

Oil filling: Open the oil tank cover and add 68# anti-wear hydraulic oil to the 2/3 position of the oil level gauge.

Electricity connection: Connect the power cord to the power supply specified by the tube press, start the motor and observe the direction of rotation. The direction of the motor should be consistent with the direction marked by the motor. If the direction of the motor is inconsistent with the marked direction, please change the position of the two power cords.
Micrometer: It is used to adjust the shrinkage of the crimping hose. It is 1mm more in the counterclockwise half a week, and 1mm less than the clockwise half a week.

Pressure adjustment: The maximum pressure of the buckle machine system is 31.5Mpa, which is adjusted by the overflow valve. The clockwise adjustment pressure increases, and the counterclockwise adjustment pressure decreases (it has been adjusted at the factory, and can be adjusted by itself if necessary).

Mold opening speed adjustment: The mold opening speed is controlled by the diverter valve and adjusted clockwise. The opening speed is increased, and the opening speed is adjusted counterclockwise. The opening speed slows down, but too fast opening speed will increase the noise. The best value is not more than 10Mpa (it has been adjusted before leaving the factory, you can adjust it yourself if necessary).